The joint stock company ŽĎAS based in the town Žďár nad Sázavou commenced their production more than 65 years ago. At present, the company has about 2500 employees.

 

Manufacturing program of the company ŽĎAS is focused on production of forming machines, forging presses, metal scrap processing equipment, rolled product processing equipment, castings, forgings, ingots and tooling, especially for the automotive industry.


The manufacture takes place within the shops of ŽĎAS, which are equipped with the machinery intended for light and heavy machining, assembling and testing of single products.
 

The advanced designing and development unit along with the international certifications guarantee the quality and reliability.
 

Quality system and other services. The advanced designing and development unit along with certifications as per the standards EN ISO 9001:2008 and EN 729-2, EN ISO 140001:2004 and OHSAS 18001:2007, and along with other product and process certificates and skilled personnel in accordance with the internationally valid standards guarantee the quality and reliability of the products of ŽĎAS company.

Joint-stock company ŽĎAS has passed Porsche audit
In 2016, the joint-stock company ŽĎAS was subjekt to supplier‘s assessment by Porsche Werkzeugbau GmbH. The German company mostly cooperates with the Tool Shop Division; however, the assessment refers to the overall company and each of us may be proud of reaching such great results in the supplier’s audit, especially in the area of quality, meeting deadlines and pricing. Porsche management declare that both of the companies expect further constructive and good cooperation.
Delivery of First Kaplan Turbine Runner for Hydroelectric Power Plant Brandýs nad Labem
Having passed the defined scope of tests, on Thursday 24th August 2017, the first assembly of Kaplan turbine runner, manufactured for hydroelectric power plant located in Brandýs nad Labem, set for its first trip from the Tool Shop Division. Manufacture has been realized for ČKD Blansko Engineering, which provides the complete reconstruction of the power plant, including demounting of the complete set, manufacture of new chamber of the runner, manufacture of new runner which is provided by the joint-stock company ŽĎAS, manufacture of new stator blades, new brake, reconstruction of generator, complete exchange of hydraulic brake system and overall reconstruction of the electric part.
Ceremonial activation of the forging unit in Germany
The forging unit with CKV 2000 press, two QKK 8 manipulators and QHK 8 ingot bogie was set into operation with attendance of the District Administrator Michael Geisler and the Minister of Finance Georg Unland in BGH Edelstahlwerk.